2011
– Alain Moatti is received into the Academy of Architecture
Awards
2008
– The most beautiful works in metallic construction – National Prize
Prize awarded to the Grande Halle in Arles.
Nature of the operation: rehabilitation and reconversion of a 19th century SNCF boiler-works.
Cost of the work: 7 M€ HT
– Designer Days Trophies- National prize
Prize awarded for the scenography of the exhibition “Entropy” for the House of Baccarat in Paris during Designer’s Days.
Cost of the work: 0.06 M€ HT
2007
– The talent of seduction – National prize
Prize given by the Sommet du Luxe et de la Création to the Moatti & Rivière Agency for the whole of their projects.
Nominations
2009
– Mies van der Rohe Prize – International Prize
Selected project: Champollion Museum – Scripts of the World in Figeac.
Nature of the operation: rehabilitation of a 14th century building to house the Champollion Museum.
Cost of the work: 4.5 M€ HT
2008
– Mapic Awards – International Prize
Selected project: 65 Croisette in Cannes, Developer of the Year category.
Nature of the operation: construction of a collection of eight luxury boutiques.
Cost of the work: 4.3 M€ HT
– World Architecture Festival – International Prize
Selected project: 65 Croisette in Cannes, Developer of the Year category.
Nature of the operation: construction of a collection of eight luxury boutiques.
Cost of the work: 4.3 M€ HT
– Crystal Globes – National prize
The Crystal Globes, awards from the French press for the arts and culture, selected the Moatti & Rivière Agency in the category Design – Architecture for the whole of their projects.
2007
– The Silver T-Square – National prize
Selected project: Champollion Museum – Scripts of the World in Figeac.
Nature of the operation: rehabilitation of a 14th century building to house the Champollion Museum.
Cost of the work: 4.5 M€ HT
2004
– The Silver T-Square – National prize
Selected project: Headquarters of the Jean-Paul Gaultier Group in Paris.
Nature of the operation: rehabilitation of a 20th century building to house the headquarters of the Jean-Paul Gaultier Group.
Cost of the work: 4.5 M€ HT